🍳 Costs · Kitchen

Kitchen renovation cost in Spain in 2026

Cabinets, worktop, services, building work and appliances: how kitchen renovation cost is built and how to compare quotes.

Reading time8 min
LevelIntermediate
TypeRenovation
Key ideaSeparate cabinets, worktop, building work and appliances before comparing quotes.
IN 30 SECONDS

Separate cabinetry, services, worktops and appliances

  • A kitchen combines building work and equipment, so a single total can hide major quality differences.
  • In the BricoDato example for 10 m², 5 linear metres, a full standard renovation and appliances included, the reference is about €17,670 and the range about €13,600–€23,500.
  • Relocating services, adding an island or choosing higher-grade cabinetry can move the total quickly.
01 · LEARN

The four blocks to separate

Break the quote into cabinetry, worktop, building work and services and appliances. If there is an island or peninsula, list it separately.

02 · LEARN

Indicative standard-kitchen example

For a 10 m² kitchen, about 5 linear metres of cabinetry, full renovation, standard quality and appliances included, the BricoDato estimator gives a reference around €17,670. The example range is approximately €13,600–€23,500.

The range is wide because cabinets, worktops, appliances and service alterations vary significantly.
03 · LEARN

How to compare kitchen quotes

  • Cabinet length and layout.
  • Door, carcass and hardware specification.
  • Worktop material and thickness.
  • Appliance brands and models.
  • Water, drainage and electrical points.
  • Demolition, waste and finishing.
04 · LEARN

Where savings are usually safer

Keeping existing water and drainage positions, avoiding unnecessary bespoke solutions and comparing worktop grades can contain cost. Cutting quality on frequently used hardware, electrical work or substrate preparation is usually a weaker saving.

05 · LEARN

Measure properly before ordering cabinets

A kitchen needs accurate measurements of walls, corners, columns, windows, service points, heights and access. Professional measurement before manufacture reduces expensive alterations.

COMMON QUESTIONS

Frequently asked questions

How long does a kitchen renovation take?

A full renovation can take several weeks across demolition, services, finishes, cabinetry and worktop installation. Manufacturing lead times can control the schedule.

Should appliances be included in the quote?

They can be included or excluded, but the decision and the models or allowance should be explicit.

Does an island add much cost?

It can, especially if it needs power, water, extraction or additional worktop material.

NEXT STEP

Continue with these tools

PRACTICAL DECISION GUIDE

Split a kitchen estimate into decisions you can control

Kitchen budgets combine cabinetry, appliances, worktops and building services. A single 'per metre' price rarely says whether appliances, electrical upgrades, flooring or removal are included.

Example to adapt

Imagine a 3.2 m cabinet run and a separate 1.8 m return. Before choosing units, draw openings and fixed plumbing and ventilation routes, note wall squareness and check appliance clearances. Request three distinct prices: units/worktop, installation, and any plumbing or electrical relocation.

Budget blockQuestionsCost risk
CabinetryInternal fittings and door fronts included?Different specification
Worktop and splashbackMaterial, cut-outs and edges?Fabrication extras
Building servicesWater, electrics, ventilation changes?Unexpected specialist work

Checks before acting

  • Confirm dimensions and appliance model before ordering made-to-measure cabinetry.
  • Specify whether removal, waste and making-good are included.
  • Compare like-for-like worktop specifications and fixing details.
  • Reserve decisions about moving gas, water or electrical points for qualified trades.
Important: Any example is for planning scope rather than predicting real market prices. Obtain current local quotes for actual cost and safety-critical work.

Keep a useful record: Keep cabinet layout, appliance list, worktop drawings, contractor scope and exclusions.

Kitchen quotation · Scope comparison

Turn two kitchen offers into comparable totals

A quote for five linear metres of cabinetry does not prove that appliances, wall units, drawers, panels and installation are included. Check the actual cabinet schedule and worktop drawing before treating the totals as equivalents.

Illustrative comparison

Suppose offer A costs €12,000 including the selected worktop cut-outs and appliance fitting. Offer B is listed at €11,400 but excludes €450 of cut-outs and €400 of installation. For the same scope, B becomes €12,250, €250 more than A. These are fictional values, not current kitchen prices.

Keep the basis identical

Compare the same appliances, worktop thickness, units, panels and handles, delivery, connection work, disposal and applicable VAT. Do not add an item twice if it already appears in the quoted price.

Check the drawing before ordering

Drawing or scheduleWhat can be missed
Cabinet elevationNumber of base and wall units, internal drawers, fillers, plinth, end panels and door swing
Appliance scheduleExact model dimensions, connections, ventilation clearances and whether delivery/fitting is included
Services and building workWater/drainage relocation, electrical circuits, extraction route, tile repairs and rubble disposal

Qualified trades should check any alteration to fixed gas, electrical, water and ventilation systems. The designer should verify the final site dimensions before bespoke fabrication.

Use the kitchen renovation estimator for an early scope budget, then seek written local quotations.